Jingchu net (reporter Wang Chun, Lu Teng) Shiyan as the core of the south to North Water Diversion Project water source area, has a "sacred mission of North River water supply" and ensure water quality, Qiang Minsheng, promote the transformation of. Since 2013, Shiyan around the "five LIAN", launched a "green storm", green has become a characteristic of Shiyan's largest.
let be the same outside and inside city rain sewage diversion
walks in Shiyan city streets, trees everywhere, a number of river wear and the city, the water clear. This is the city's "face", "son" and how? cheap jerseys usa
June 13th, the Department of Shiyan city urban construction under the guidance of the staff, the reporter walked into the city Bai River (a tributary of the river god) the fire sewage outfall ditch 2 meters high in the underground culvert, and heating pipelines, cables, drainage ditch in order, upstream water to sink into the channel of Bai River, near the tens of thousands of lives the sewage in a closed box on both sides of the culvert quietly flowing. These sewage, will be sent to the God River sewage treatment plant for processing.
Shiyan City Housing Project Construction Committee Director Zheng Wencheng told reporters, Shiyan City area a total of 12 directly into the Danjiangkou Reservoir River, 7 river water quality compliance, but there are still God set River, Si River, Jianhe River, cheap wholesale jerseys mountains and rivers, stubborn, five rivers due to historical reasons, the water quality is not up to the standard of state.
to do a good job of five river comprehensive management work fundamentally, Shiyan differ not to lean, make every attempt to carry out comprehensive treatment project in Wuhe self financing. Its core is the "rain cheap customized jerseys sewage diversion", the city sewage all received into the network, let the river is no longer the "pollutant".
according to the introduction, in accordance with the State Council approved the "Danjiangkou reservoir area and upstream water pollution control and soil conservation" 1025 "planning", Shiyan city planning and construction of the main supporting the sewage pipe network total length of 1490 km, into the river outfall remediation size 572. As of 2013 12 at the end of the main pipe network, has built 717 kilometers, 333 kilometers of which was completed in 2013. In 2014, plans to complete the sewage pipe network construction task of 150 km, has started. As of 2013 12 at the end of the month, Shiyan has completed the size into the river outfall rectification 279, this year plans to complete the remaining 293 sewage into the river mouth.
up to now, the actual investment 686000000 yuan project integrated management system. God set River, Si River, river water quality improved significantly, stubborn, Jianhe, river water quality improvement, for the two consecutive month to three kinds of water Cheap Beanies quality.
to speed up the Shiyan city water pollution control and water system reform, in April 10th of this year, Shiyan city lives build appoint official and water control and management leader Beijing originwater company signed a "God set River sewage treatment plant commissioned operation agreement", since April 11, 2014, God River sewage treatment plant operation and management and subsequent upgrading work responsible for the company, technology. Cheap national soccer jerseys
in God River sewage treatment plant, the director told reporters, the expansion and reconstruction work in 9> processing factory
没有评论:
发表评论